Residential Rates (Schedule R)
Facilities Charge: $30.35
Energy Charge (kWh): $0.118059
Commercial Rates
Small Commercial Service Rates (Schedule C-1)
Single Phase Under 25 kW
Facilities Charge: $30.35
Energy Charge (kWh): $0.118059
Small Commercial Service Rates (Schedule C-3)
Three Phase Under 25 kW
Facilities Charge: $42.27
Energy Charge (kWh): $0.103557
Commercial & Industrial Service Rates (Schedule D)
Single or Three Phase Greater Than 25 kW & Less Than 3,000 kW
Facilities Charge: $58.42
Demand Charge (kW): $9.29
Energy Charges (kWh)
First 200 kWh/kW: $0.064124
Second 200 kWh/kW: $0.053714
Third 200 kWh/kW: $0.048424
Over 600 kWh/kW: $0.043291
Industrial Service Rates (Schedule I-E)
(Existing Members Only) 3,000 kW to 10,000 kW
Service Charge: $424.97
First 3,000 kW: $49,195.52
Demand Charge (kW): $16.40
Energy Charge (kWh): $0.040302
Industrial Service Rates (Schedule L)
3,000 kW to 5,000 kW
Service Charge: $424.97
Demand Charge (kW): $15.62
Energy Charge (kWh): $0.048000
Outdoor Lighting (Schedule OL)
100-Watt High Pressure Sodium: $11.32
250-Watt High Pressure Sodium: $15.72
250-Watt High Pressure Sodium Flood: $16.50
LED Yard Light (6,000-9,000 lumens): $11.54
LED Street Light (9,300-15,000 lumens): $14.10
LED Flood Light (14,500-23,000 lumens): $19.90
1,000-Watt Metal Flood: $41.34
Fees
Field Collection Fee: $16.00
Connection/Reconnection Fee: $24.00
Returned Check Fee: $5.60
Meter Test Request Fee: $123.00
Meter Pole Perpetual Lease Fee: $177.00
If a service disconnected for non-payment requires re-connection at a transformer, additional costs will be charged. See the JPEC tariff.
Renewable Resources Energy
Per 100 kWh Blocks
Members may choose to have a portion of their energy generated with renewable resources. Renewable resources must be purchased in 100 kWh blocks. The rate listed is in addition to the regular rate for the member’s specific rate class.
Residential/Commercial: $1.05
Industrial: $1.695